Your cart is empty
Sigen Gateway C120-6 C&I 120kW - ATS Grid Box for Sigen TP inverters is a three-phase 120 kW ATS Grid Box for Sigen TP inverters, supporting up to 6 inverter ports. It provides 0 ms seamless switching and 350 ms reverse power protection.
Sigen Gateway C120-6 C&I is a three-phase ATS Grid Box with a nominal power of 120 kW, designed for commercial and industrial systems with Sigen TP inverters. It supports up to 6 inverter ports and multiple SigenStor connections in a microgrid.
| Grid connection type | Three-phase |
| Nominal AC voltage | 380~400 V |
| Nominal AC current | 182.4 A |
| Nominal AC power | 120 kW |
| AC frequency | 50 / 60 Hz |
| Backup switch transition time | 0 ms |
| Overvoltage category | III |
| Number of inverter ports | 6 |
| Max. AC input current | 45.6 A |
| Cooling | Natural convection |
| Protection degree | IP54 |
| Communication | Fast Ethernet, RS485, dry contact |
| Mounting | Wall-mounted |
| Dimensions (W×H×D) | 850 × 1152 × 305 mm |
| Weight | 74 kg |
| Operating temperature range | -30~55°C |
Sigen Gateway C120-6 C&I 120kW - ATS connection switchgear for Sigen TP inverters — 120 kW — B2B wholesale prices for installers and contractors. Check availability and terms of cooperation: contact us.
B2B
Individual terms, account manager.